ANCHORAGE COUNTRY CLUB The jewel of the village, this amenity buildings sits as the centrepiece at The Anchorage Lifestyle Village. The Clubhouse and Wellness Buildings boast a variety of spaces, including a café, lounge, dining area, billiards room, library, multi-functional rooms, swimming pool and a [...]
ACE CLUB HOUSE
Janelle Imeson2026-09-29T16:13:18+13:00ACE CLUB HOUSE Located at 175 Carters Road, Amberley, this new building of ~1200 m2 comprises various amenities for the residents of the Amberly Country Estate including a lounge, café, dining areas, bar, multifunction room, snooker room, gym, library, crafts room, indoor pool and spa [...]
METLIFECARE GULF RISE – PRECINCT 2 CARE BUILDING
Janelle Imeson2023-11-18T12:17:19+13:00METLIFECARE GULF RISE – PRECINCT 2 CARE BUILDING The Gulf Rise Precinct 2 development includes a three-level engineered timber Care Building, which incorporates prefabricated bathroom pods, cross-laminated timber (CLT) walls and floors, prefabricated external walls from Symonite and a prefabricated light timber frame roof cassette [...]
METLIFECARE FAIRWAY GARDENS CARE BUILDING
Janelle Imeson2023-11-18T12:18:22+13:00Metlifecare Fairway Gardens Care Building The three-storey building is located next to the future planned apartment blocks D4 and D5 and on the corner of Botany Road/Cascades Road. The building is a mirrored Z shape structure with two wings located at the north and south [...]
HUTT VALLEY HEALTH HUB
Janelle Imeson2025-05-30T14:09:47+12:00HUTT VALLEY HEALTH HUB Enovate provided the structural peer review for this project. The structure was designed for high important level (IL4) as a potential post-disaster facility and incorporated a predominately mass timber superstructure. The timber superstructure consisted of Laminated Veneer Lumber (LVL) [...]
METLIFECARE – GULF RISE
Janelle Imeson2023-11-18T13:23:52+13:00METLIFECARE GULF RISE A new retirement village with multiple 4-5 storey buildings over a large basement/podium. A number of structural materials and solutions were tested to ensure a cost-effective structural solution was adopted. Post-Tensioned floor systems were chosen with precast shear walls and shallow foundations. Highly co-ordinated structural [...]
METLIFECARE FAIRWAY GARDENS
Janelle Imeson2025-05-30T14:01:48+12:00METLIFECARE FAIRWAY GARDENS A new retirement village with multiple three storey buildings including apartment, amenity and care facilities. The amenity building is to be constructed over an in-ground basement requiring considerable early co-ordination for vertical load bearing structure to avoid costly transfer structures. A cost-effective solution [...]






