ARAWA STREET STAGE 1

2023-11-18T12:10:58+13:00

ARAWA STREET STAGE 1 This project is a four storey office / commercial structure in central Rotorua that consists of engineered timber moment-resisting frames, plywood sheathed shear walls, cross-laminated timber (CLT) floors / roof and a decorative glue-laminated timber stair with a tree-shaped support structure [...]

TE WHARE POKAPŪ

2024-02-14T09:09:21+13:00

Te Whare Pokapū This project involved the design of a single storey 45m x 60m industrial warehouse with steel portal frames, perimeter precast concrete panels, light gauge purlins and gantry crane structure which is all supported on shallow foundations. This building is the first stage [...]

THE ROCK

2023-11-18T12:12:41+13:00

The Rock The Rock is a renovation and extension project located on Waiheke Island. The project converts an existing restaurant with associated flat/office space into three separate tenancies. The existing roof and floor are strengthened to allow for increased loading from the future rooftop terrace [...]

40 EDEN CRESENT

2023-11-18T12:13:17+13:00

40 EDEN CRESENT This project involved a Detailed Seismic Assessment (DSA) for 40 Eden Crescent, Auckland. The primary purpose of the investigation is to assess the seismic performance of the existing building to determine if it satisfies the requirements established in the Building Act 2014 [...]

STAR MOUNTAIN PLAZA

2023-11-18T12:13:50+13:00

STAR MOUNTAIN PLAZA At his previous employment, Mike was the lead engineer through the design phase. 30m span timber arch canopy for Star Mountain Plaza in Port Moresby, Papua New Guinea. The structural system is New Zealand made glue-lamented timber arches and purlins with steel [...]

HUTT VALLEY HEALTH HUB

2025-05-30T14:09:47+12:00

HUTT VALLEY HEALTH HUB Enovate provided the structural peer review for this project. The structure was designed for high important level (IL4) as a potential post-disaster facility and incorporated a predominately mass timber superstructure. The timber superstructure consisted of Laminated Veneer Lumber (LVL) [...]

MOTAT

2023-11-18T12:21:26+13:00

Motat This project involves the renovation of Building 5 at MOTAT, which has been divided into two stages. The initial stage began with an Initial Seismic Assessment (IEA) to evaluate whether the existing structure complies with the requirements outlined in the Building Act 2014 and [...]

ST PAUL’S IN THE PARK

2023-11-18T12:22:36+13:00

ST PAUL’S IN THE PARK St. Pauls in the Park is an Anglican Church and Community Building in Flat Bush Auckland. Internal spaces include an open Auditorium, community rooms, lounges, offices, and utilities. The structural system incorporates a complex roof form that is supported by [...]

Go to Top