METLIFECARE GULF RISE

A new retirement village with multiple 4-5 storey buildings over a large basement/podium. A number of structural materials and solutions were tested to ensure a cost-effective structural solution was adopted. Post-Tensioned floor systems were chosen with precast shear walls and shallow foundations. Highly co-ordinated structural design at a preliminary level optimised the structural efficiency and eliminated multiple transfer structures between the residential, communal and basement layouts. The development includes a three level engineered timber Care Building, which incorporates prefabricated bathroom pods, cross-laminated timber walls and floors, prefabricated external walls from Symonite and a prefabricated light timber frame roof cassette system.

  • Stage: Stage 3 (Final) Under Construction 2023

  • Client: Metlifecare

  • Architect: Warren & Mahoney (Stage 1) Ignite (Stage 2 & 3)

  • Project Manager: RCP/TSA

  • Construction cost: $120M